本文へ移動

サイトナビゲーションへ移動

検索ボックスへ移動

サイドバーへ移動

ここは、本文エリアの先頭です。

Analysis for Integration of G-HAB ECLSS

JAXA Supercomputer System Annual Report February 2025-January 2026

Report Number: R25EAE30300

Subject Category: Space Exploration

PDF (to be added)

  • Responsible Representative: Norihito Tsuji, Human Spaceflight Technology Directorate, Lunar Gateway Habitation Project Team
  • Contact Information: Ryosuke Takahashi(takahashi.ryohsuke@jaxa.jp)
  • Members: Kenji Kano, Masaru Saijo, Daisuke Sugawara, Ryosuke Takahashi

Abstract

"Gateway" is the manned base to be constructed in lunar orbit as a relay base for sustained lunar surface exploration activities, in the international space exploration plan "Artemis Project". Space Agencies participating in the ISS project are mainly involved, and they share the development of each module and equipment. In the future, 4 astronauts are scheduled to stay Gateway for about 30 days a year, and it is expected that it will also be used as a base for manned exploration of Mars (Moon to Mars). Japan is mainly in charge of providing the Environmental Control and Life Support System (ECLSS) in the International Habitation Module (I-Hab). ECLSS includes equipment for controlling air circulation, air pressure, oxygen supply, temperature and humidity, and for removal of CO2 and toxic gases. In addition to ECLSS, Japan will also provide batteries to be used in the Gateway modules (I-Hab, Mini Habitat (HALO)), internal/external cameras of the I-Hab, and pumps to circulate the coolant of Thermal Control System (TCS) in I-Hab. In addition to the above, which will lead to future manned exploration and ground technology, the mission will also transport research equipment and tools (Extra-Vehicular Activity (EVA) suits, and research instruments) needed for lunar surface activities, as well as supplies to provide food, clothing and shelters for astronauts by the Gateway resupply vehicle.

Reference URL

Please refer to https://www.exploration.jaxa.jp/assets/img/program/Leaflet_Gateway_A4.pdf .

Reasons and benefits of using JAXA Supercomputer System

The Gateway, which will be placed into lunar orbit, has strong resource constraints (Launch Mass etc.). So unlike ISS, it is considered to outfit the various equipment in an exposed state without cover panel, and it will bring a very complex internal shape. In addition, I-Hab module is integrated by ESA, and there is no available module including mockup in Japan. Thus, the verification of ECLSS functions and performance will largely depend on analysis, and the timing of demonstration will be limited in almost the final phase of development.

Air circulation analysis, oxygen mixing and diffusion analysis etc. will be required. However, due to the above situation, the analysis needs to be done with quite complex shape, and it requires a very large computational resource. In addition, if a risk becomes apparent in the final phase, the impact will be difficult to accept. From those perspectives, it is considered that performing accurate analysis in early phase using the JAXA Supercomputer System (JSS3) will play an important role in completing the G-HAB project in success.

Achievements of the Year

Air flow distribution and mixing analysis has conducted to explore countermeasures for the I-Hab intramodule ventilation issue which was identified in this activity in the last fiscal year. We performed this analysis with the complex shape in the module and 2 fluieds, flesh air from ECLSS and old CO2-rich air from the other module, to evaluate air mixing. As a result, we could identify some countermeasures changing the injection direction and/or the flow rate allocation from multiple air diffusers, which are considered effective based on the quantitative evaluation. Now we are preparing for a design change coordination with ESA.

Publications

N/A

Usage of JSS

Computational Information

  • Process Parallelization Methods: MPI
  • Thread Parallelization Methods: N/A
  • Number of Processes: 132
  • Elapsed Time per Case: 30 Hour(s)

JSS3 Resources Used

 

Fraction of Usage in Total Resources*1(%): 0.00

 

Details

Please refer to System Configuration of JSS3 for the system configuration and major specifications of JSS3.

Computational Resources
System Name CPU Resources Used
(Core x Hours)
Fraction of Usage*2(%)
TOKI-SORA 0.00 0.00
TOKI-ST 162.99 0.00
TOKI-GP 0.00 0.00
TOKI-XM 0.00 0.00
TOKI-LM 0.00 0.00
TOKI-TST 264.05 0.00
TOKI-TGP 0.00 0.00
TOKI-TLM 0.00 0.00

 

File System Resources
File System Name Storage Assigned
(GiB)
Fraction of Usage*2(%)
/home 0.00 0.00
/data and /data2 0.00 0.00
/ssd 0.00 0.00

 

Archiver Resources
Archiver Name Storage Used
(TiB)
Fraction of Usage*2(%)
J-SPACE 0.00 0.00

*1: Fraction of Usage in Total Resources: Weighted average of three resource types (Computing, File System, and Archiver).

*2: Fraction of Usage:Percentage of usage relative to each resource used in one year.

 

ISV Software Licenses Used

ISV Software Licenses Resources
ISV Software Licenses Used
(Hours)
Fraction of Usage*2(%)
ISV Software Licenses
(Total)
12.05 0.01

*2: Fraction of Usage:Percentage of usage relative to each resource used in one year.

JAXA Supercomputer System Annual Report February 2025-January 2026